Emergency boiler replacement after breakdown prevents hotel closure
The Challenge
A fully-booked hotel suffered a boiler breakdown, meaning the hotel was left with no heating and hot water. A new boiler was put on order, however, with many weeks’ lead time, a temporary boiler replacement was needed.
The Solution
An ICS Cool Energy Rental Applications Engineer resolved the situation during the same day by delivering a 300kW boiler plant room to site. This unit housed in a weather proof enclosure is complete with two heat exchangers and a priority management weighted towards the DHW. This meant that the heating ran all the time with priority given to on demand domestic hot water.
[show_gallery /]
The Result
Within 24 hours the hotel was back with full service and satisfied guests. ICS Cool Energy Hire sales director comments: The hotel was in urgent need for both hot water and heating. Our sales engineer was able to provide a solution within hours of being called.
[testimonial name=”ICS Cool Energy”]”“Our customer needed an urgent response to both their heating and hot water needs and we were able to satisfy both using our energy efficient boilers coupled with a calorifier unit.””[/testimonial]
Featured Product Categories
Your boiler options
All our boilers are housed within a steel container and skidded enclosures to provide weather-resistant protection enabling simple external positioning and increased protection from environmental elements.