The Challenge
A fully-booked hotel suffered a boiler breakdown, meaning the hotel was left with no heating and hot water. A new boiler was put on order, however, with many weeks’ lead time, a temporary boiler replacement was needed.
The Solution
An ICS Cool Energy Rental Applications Engineer resolved the situation during the same day by delivering a 300kW boiler plant room to site. This unit housed in a weather proof enclosure is complete with two heat exchangers and a priority management weighted towards the DHW. This meant that the heating ran all the time with priority given to on demand domestic hot water.
The Result
Within 24 hours the hotel was back with full service and satisfied guests. ICS Cool Energy Hire sales director comments: The hotel was in urgent need for both hot water and heating. Our sales engineer was able to provide a solution within hours of being called.
““Our customer needed an urgent response to both their heating and hot water needs and we were able to satisfy both using our energy efficient boilers coupled with a calorifier unit.””
View All Case Studies