Five tips for crisis planning. Coping when there’s a production disaster

Understanding how your premises and industrial plant & equipment will cope in a disaster from a fire, flooding, power loss or system breakdown is incredibly important.

Here Russ Baker, UK Sales Director of the hire division at leading temperature control specialist ICS Cool Energy, sets out the five key steps that will help you survive a crisis.

  1. Conduct a site and operations audit
    Understanding where the risks lie needs to cover all site operations and not just the big stuff. In an industrial setting, process temperature is paramount so chiller equipment should be high on the list. It’s crucial to understand where and why equipment is used as part of the auditing process.
  2. Keep a record
    Make sure the audit information is recorded alongside any power or utility requirements, and that the information is easily available. Key personnel may be off site during a crisis so make sure others have the plans, hard copies are kept on site and that other copies are stored in an off-site location because a central server may also be knocked out.
  3. Put a Plan B into place
    With a site assessment complete, this is the basis for deciding what contingency equipment is required with your equipment supplier, as well as an activation plan. Check whether your supplier can activate your plan 24/7 – there’s no point having a contingency plan if they’re only available during standard office hours.
  4. Carry out any remedial works
    All chiller equipment requires electrical and mechanical connections, but this can be a major problem when you’re up against it and coping in a crisis. Remedial works can include simple solutions such as new pipework being installed or new power connections so the site is ready to accommodate emergency equipment that will get you back up and running quickly.
  5. Consider access
    What about access to the site itself. Consider where existing kit is located, for example large industrial chillers can often be found in a plant room or alongside the process machinery. In the event of a breakdown or replacement, how easy is it to remove or replace that piece of equipment. Make a note in your plan not only of the equipment required but also where it will be located – a designated slot in the car park, close to the building, may be all that’s needed. Wherever you choose, access points and any remedial works required should be identified in advance of any crisis.

A contingency plan is an important part of any business strategy and therefore finding the right partner is essential. They can help guide companies through the site assessments, organise the remedial works and be at the other end of the phone 24/7 in the event of any breakdown or crisis. When downtime is not an option, it really does pay to be prepared.

ICS Cool Energy sales engineers can provide helpful, practical advice to ensure that you are prepared and able to minimise the risk of production downtime. Please contact us on 0800 840 4210 for more information.

Related Articles

Boiler Hire Advice Underfloor Heating

July 31, 2024

Essential Advice On Hiring Boilers For Underfloor Heating Projects

Underfloor heating systems have transformed the way we heat our spaces, offering exceptional comfort and efficiency. However, during the construction phase, finding a reliable heating...

Read More
Time to replace your TCU?

July 16, 2024

Is it time to replace your Temperature Control Unit?

Temperature control units (TCU) are crucial in maintaining the desired temperature in various manufacturing facilities. Like any appliance, temperature control units can show signs of...

Read More

July 4, 2024

ICS Cool Energy Enhances Customer Experience with New Customer Care Team

New dedicated team and user-friendly website to streamline customer support and enhance communication. In a significant step towards enhancing customer engagement and service efficiency, ICS...

Read More