Specifications:
Boiler 150 V2 | ||
---|---|---|
Size | 2,500 x 1,650 x 2,450(LxWxH) mm | |
Weight | 2350Kg | |
Heating Power | 150kW | |
Heating Mode | -°C | |
Temperature (Supply/Return) | -°C | |
Water Connections | 2”/DN 50 | |
Boiler Fuel Consumption at full load | Diesel15.5Litres/hr | |
Boiler Fuel Consumption at full load | Gas17.4m3/hr | |
Part Load turn down | Diesel2 : 1 | |
Part Load turn down | Gas6 : 1 | |
Safety Valve | 3 Bar | |
Expansion Vessel | -Litre | |
Power Supply | 230/1/50V / ph / Hz | |
Electrical Supply | CEE 16 A |
Related Case Studies
Read how we have made it work for related businesses.
A household manufacturer of base chemicals required a reliable solution for when their existing thermal oil heating system failed its annual insurance inspection. The existing system driven by a steam boiler provided thermal transfer oil to a number of vital reaction vessels around the site via a heat exchanger feeding a ring main.
View Case Study...A fully-booked hotel suffered a boiler breakdown, meaning the hotel was left with no heating and hot water. A replacement boiler was put on order, however, with many weeks’ lead time, a temporary temperature solution was needed.
View Case Study...Following the extensive refurbishment of a leisure centre the building’s on-site boiler failed and a quick replacement was needed fast.
View Case Study...A manufacturing facility was to be kept unused for an extended period with the option of it being brought back into use quickly at any time. To ensure the area in question was kept in tip top condition it was necessary to keep it heated throughout the unused period. However, it would not be economic to fire the facilities large boilers for this purpose.
View Case Study...A primary school’s maintenance team was faced with no hot water for the school. The 25 year old boilers had failed, a fast solution was needed
View Case Study...Recreation and leisure facilities need to keep people ‘in the swim’ during refurbishment works and ICS has the complete range of hire solutions.
View Case Study...Minimising the misery and interruption to daily and business life when floods happen is a speciality for ICS Cool Energy’s hire division, with a range of heating and cooling solutions that are ready to go at a moment’s notice.
View Case Study...An old heating system failed at a leading BMI Healthcare hospital,
leaving wards with no hot water and a potentially business critical
situation. But the hospital’s contingency planning and partnership
with ICS Cool Energy meant that the technical team swung into
action to restore full working order within hours.
The teams at Heathrow make sure that nearly 200,000 passengers every day are able to y the world, but working conditions on the ground can be uncomfortable and cold – especially in the winter. ICS Cool Energy’s hire specialists were called in to provide efficient temporary heating for the engineering and service people working in big draughty hangers and ensure standard working temperatures comply with legislation.
View Case Study...An ICS Cool Energy boiler hire solution was ideal for the facilities managers of a three-storey office building while waiting six months for available funds for a new permanent heating and hot water boiler.
View Case Study...When a boiler providing domestic hot water for a district heating system on a military base just stopped working...
View Case Study...Energy efficiency is at the heart of ICS Cool Energy’s temperature control solutions and that goes a step further
View Case Study...