Related Case Studies
Read how we have made it work for related businesses.
Read how we have made it work for related businesses.
An international food and drink supplier of canned fish called in ICS Cool Energy as existing process air conditioning systems failed to cope in 35°C
View Case StudyThe high heat lasers generate is a constant challenge. The ICS Cool Energy Hire team provides short term rapid response and long term solutions.
View Case StudyAmbitious expansion plans to double capacity meant that a major Herefordshire cider producer needed expert help with essential tepmperature control.
View Case StudyIt was ‘stop press’ for a major printing company when the site’s chiller failed in the middle of the night. Rapid response and solution was needed
View Case StudyData Centres are integral to everyday life and ICS Cool Energy has a comprehensive range of high capacity, energy efficient solutions
View Case StudyTurkey is the top choice in around 75% of all homes to help celebrate Christmas but delivering the best birds to our tables is a special challenge for the producers
View Case StudyIt’s a manufacturing nightmare when breakdowns happen and it’s always at exactly the wrong moment. That’s where the ICS Cool Energy hire team steps in.
View Case StudyA faster than anticipated refurbishment of a medical company’s building meant that it was ready to occupy earlier than planned in the summer. But with the permanent temperature control system yet to be completed, an ICS Cool Energy temporary hire cooling solution provided the ideal answer to keep the vital biological samples intact.
View Case StudyThe ICS Cool Energy hire team helps a leading yoghurt producer to keep its cool – and more than £1million worth of stock in perfect conditions – when it’s time for essential maintenance that requires the planned shutdown of the warehouse’s state of the art ammonia cooling system. Meticulous planning and timing of equipment installations and deliveries with no interruption to the site’s 24/7 operation is all part of a day’s work for the ICS Cool Energy hire team.
View Case StudyICS Cool Energy hire team’s project planning skills were put to the test with a 1mW cooling solution for a large resin manufacturer
View Case StudyEssential cooling for a gas plant where gas is refined and condensed to fuel the National Grid needed a summer boost
View Case StudyFood manufacturers are governed by stringent rules and regulations. Our case study demonstrates how our temperature control equipment can help them meet them.
View Case StudyWhy not pick up the phone and talk to our friendly and experienced team? We make it easy - whether your need is big, small, long or short term, we're here to help.
for a free no obligation quote