 
{"id":86464,"date":"2026-05-29T11:47:06","date_gmt":"2026-05-29T11:47:06","guid":{"rendered":"https:\/\/www.icscoolenergy.com\/ie\/?post_type=case_study&#038;p=86464"},"modified":"2026-05-29T11:47:10","modified_gmt":"2026-05-29T11:47:10","slug":"safeguarding-hospital-cooling-ics-cool-energy-delivers-emergency-chiller-solution-during-infrastructure-upgrades","status":"publish","type":"case_study","link":"https:\/\/www.icscoolenergy.com\/ie\/case-studies\/uncategorized\/safeguarding-hospital-cooling-ics-cool-energy-delivers-emergency-chiller-solution-during-infrastructure-upgrades\/","title":{"rendered":"Safeguarding Hospital Cooling: ICS Cool Energy Delivers Emergency Chiller Solution During Infrastructure Upgrades"},"content":{"rendered":"\n<h3 class=\" wp-block-heading eplus-wrapper\" id=\"h-a-large-hospital-undertook-a-major-initiative-to-upgrade-its-infrastructure-to-ensure-continuity-and-maintain-system-redundancy-during-the-summer-months-of-improvement-works-hospital-administrators-engaged-ics-cool-energy-to-provide-a-reliable-temporary-cooling-solution-enabling-uninterrupted-healthcare-services-and-minimising-operational-risks\">A large hospital undertook a major initiative to upgrade its infrastructure. To ensure continuity and maintain system redundancy during the summer months of improvement works, hospital administrators engaged ICS Cool Energy to provide a reliable temporary cooling solution, enabling uninterrupted healthcare services and minimising operational risks.<\/h3>\n\n\n\n<h4 class=\" wp-block-heading eplus-wrapper\" id=\"h-challenge\"><strong>Challenge<\/strong><\/h4>\n\n\n\n<p class=\"eplus-wrapper wp-block-paragraph\">As part of an infrastructure upgrade programme, the hospital set out to further strengthen the resilience of its cooling system. Ordinarily, one chiller would operate while the second remained on standby, ready to maintain continuity should the primary unit require support. During the upgrade works, the facility management team needed to run both chillers simultaneously even under moderate conditions. This temporarily removed built-in redundancy and increased strain on the system.<\/p>\n\n\n\n<p class=\"eplus-wrapper wp-block-paragraph\">With summer approaching and temperatures rising, the hospital required a reliable, efficient cooling system to ensure continuity across critical clinical spaces, operating theatres, wards, and communal areas. To support uninterrupted services and mitigate operational risk during the upgrade and high-demand season, administrators engaged ICS Cool Energy to provide temporary hire chillers as part of an integrated solution.<\/p>\n\n\n\n<h4 class=\" wp-block-heading eplus-wrapper\" id=\"h-solution\"><strong>Solution<\/strong><\/h4>\n\n\n\n<p class=\"eplus-wrapper wp-block-paragraph\">ICS Cool Energy was tasked with designing and deploying a complete temporary cooling system capable of taking over the building\u2019s entire load, allowing the installed chillers to be safely switched off for upgrade during the summer months.<\/p>\n\n\n\n<p class=\"eplus-wrapper wp-block-paragraph\">The solution centred on the installation of four 500kW chillers, delivering robust and reliable cooling capacity able to fully support the hospital\u2019s requirements. To overcome limitations in the site\u2019s existing power supply, particularly at the location earmarked for the equipment, ICS Cool Energy also provided two high-capacity 800kVA generators, ensuring uninterrupted operation throughout the duration of the works.<\/p>\n\n\n\n<p class=\"eplus-wrapper wp-block-paragraph\">Engineers also navigated logistical complexities, including the safe routing of hundreds of metres of flexible hose from ground level up to the rooftop plant room and the placement of equipment in a confined access route, all while keeping essential hospital access clear for emergency vehicles and staff. Due to site restrictions, it was not possible to use standard crane-mounted vehicles for installation. Instead, a separate crane was employed specifically to lift all hoses and equipment onto the hospital roof, ensuring deployment could proceed swiftly and safely.<\/p>\n\n\n<div class=\"wp-block-columns eplus-wrapper is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex eplus-styles-uid-da9c49\">\n<div class=\"wp-block-column eplus-wrapper is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<figure class=\" wp-block-image size-large eplus-wrapper\"><div class=\"wpcp-wp-lightbox-host wpcp-advanced-image-lightbox-icon-hover\"><a class=\"wpcp-wp-lightbox-image-link\" href=\"https:\/\/www.icscoolenergy.com\/wp-content\/uploads\/sites\/6\/2026\/05\/hospital-chiller-Delivery-03-scaled-1.jpg\" data-wpcp-wp-lb-image=\"1\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.icscoolenergy.com\/wp-content\/uploads\/sites\/6\/2026\/05\/hospital-chiller-Delivery-03-scaled-1-1024x768.jpg\" alt=\"\" class=\"wp-image-86465\" srcset=\"https:\/\/www.icscoolenergy.com\/wp-content\/uploads\/sites\/6\/2026\/05\/hospital-chiller-Delivery-03-scaled-1-1024x768.jpg 1024w, https:\/\/www.icscoolenergy.com\/wp-content\/uploads\/sites\/6\/2026\/05\/hospital-chiller-Delivery-03-scaled-1-300x225.jpg 300w, https:\/\/www.icscoolenergy.com\/wp-content\/uploads\/sites\/6\/2026\/05\/hospital-chiller-Delivery-03-scaled-1-400x300.jpg 400w, https:\/\/www.icscoolenergy.com\/wp-content\/uploads\/sites\/6\/2026\/05\/hospital-chiller-Delivery-03-scaled-1-768x576.jpg 768w, https:\/\/www.icscoolenergy.com\/wp-content\/uploads\/sites\/6\/2026\/05\/hospital-chiller-Delivery-03-scaled-1-1536x1152.jpg 1536w, https:\/\/www.icscoolenergy.com\/wp-content\/uploads\/sites\/6\/2026\/05\/hospital-chiller-Delivery-03-scaled-1-2048x1536.jpg 2048w, https:\/\/www.icscoolenergy.com\/wp-content\/uploads\/sites\/6\/2026\/05\/hospital-chiller-Delivery-03-scaled-1-50x38.jpg 50w, https:\/\/www.icscoolenergy.com\/wp-content\/uploads\/sites\/6\/2026\/05\/hospital-chiller-Delivery-03-scaled-1-1600x1200.jpg 1600w, https:\/\/www.icscoolenergy.com\/wp-content\/uploads\/sites\/6\/2026\/05\/hospital-chiller-Delivery-03-scaled-1-600x450.jpg 600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><a href=\"https:\/\/www.icscoolenergy.com\/wp-content\/uploads\/sites\/6\/2026\/05\/hospital-chiller-Delivery-03-scaled-1.jpg\" data-fancybox=\"wpcp-wp-img-86465\" class=\"wpcp-lightbox-trigger wpcp-advanced-image-lightbox-icon wpcp-position-top-right wpcp-advanced-image-lightbox-icon-hover wpcp-global-lightbox-icon wpcp-lightbox-icon--global wpcp-lb-icon-style-default\" data-wpcp-lb-icon-source=\"global\" aria-label=\"Open image in lightbox\" data-thumb-src=\"https:\/\/www.icscoolenergy.com\/wp-content\/uploads\/sites\/6\/2026\/05\/hospital-chiller-Delivery-03-scaled-1-300x225.jpg\" data-wpcp-lb-single=\"1\"><span class=\"wpcp-icon-container\"><svg viewbox=\"0 0 20 20\"><path d=\"M17.6585 16.025L14.2437 12.6198C15.1716 11.3338 15.6121 9.7613 15.4871 8.1819C15.362 6.60251 14.6795 5.11847 13.5607 3.99351C12.936 3.36206 12.1916 2.86066 11.3709 2.51845C10.5502 2.17623 9.66952 2 8.77995 2C7.89039 2 7.00969 2.17623 6.18899 2.51845C5.36829 2.86066 4.62395 3.36206 3.99919 3.99351C3.36594 4.61649 2.86312 5.35871 2.51992 6.17708C2.17673 6.99545 2 7.87365 2 8.76068C2 9.64772 2.17673 10.5259 2.51992 11.3443C2.86312 12.1627 3.36594 12.9049 3.99919 13.5279C5.11957 14.6901 6.62279 15.4103 8.23285 15.5562C9.84291 15.7022 11.4517 15.2641 12.7639 14.3224L16.1788 17.7275C16.3849 17.9034 16.6473 18 16.9186 18C17.1899 18 17.4523 17.9034 17.6585 17.7275C18.1138 17.16 18.1138 16.5925 17.6585 16.025ZM5.59278 12.0523C5.16258 11.6298 4.82094 11.1263 4.58774 10.5709C4.35455 10.0156 4.23446 9.41951 4.23446 8.81744C4.23446 8.21536 4.35455 7.6193 4.58774 7.06394C4.82094 6.50859 5.16258 6.00503 5.59278 5.58257C6.01644 5.15359 6.52144 4.81292 7.07838 4.58039C7.63532 4.34786 8.23308 4.22811 8.83687 4.22811C9.44066 4.22811 10.0384 4.34786 10.5954 4.58039C11.1523 4.81292 11.6573 5.15359 12.081 5.58257C12.5112 6.00503 12.8528 6.50859 13.086 7.06394C13.3192 7.6193 13.4393 8.21536 13.4393 8.81744C13.4393 9.41951 13.3192 10.0156 13.086 10.5709C12.8528 11.1263 12.5112 11.6298 12.081 12.0523C11.6573 12.4813 11.1523 12.822 10.5954 13.0545C10.0384 13.287 9.44066 13.4068 8.83687 13.4068C8.23308 13.4068 7.63532 13.287 7.07838 13.0545C6.52144 12.822 6.01644 12.4813 5.59278 12.0523Z\"><\/path><\/svg><\/span><\/a><\/div><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column eplus-wrapper is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<p class=\"eplus-wrapper wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"eplus-wrapper wp-block-paragraph\">ICS Cool Energy team also undertook careful calculations to account for pressure drops throughout the extensive pipework. While the hospital\u2019s main circulating pumps remained incorporated within the setup, additional measures were taken to sustain optimal flow and pressure across the temporary installation. Four 4-inch pumps were fitted on the suction line, complemented by an inverter-driven 4-inch pump on the delivery side. This configuration ensured that water circulated efficiently, maintaining stable cooling performance in all areas of the building at all times.<\/p>\n<\/div>\n<\/div>\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\" wp-block-spacer eplus-wrapper\"><\/div>\n\n\n\n<h4 class=\" wp-block-heading eplus-wrapper\" id=\"h-results\"><strong>Results<\/strong><\/h4>\n\n\n\n<p class=\"eplus-wrapper wp-block-paragraph\">By installing a robust and reliable temporary cooling solution, ICS Cool Energy enabled the facilities management team to confidently maintain correct temperatures throughout even the hottest summer months.<\/p>\n\n\n\n<p class=\"eplus-wrapper wp-block-paragraph\">The complete delivery and installation process was managed efficiently by ICS Cool Energy\u2019s project managers, resulting in a clean and orderly site with no disruption to hospital operations, patients, staff, or visitors. The hospital benefited from reassurance and continuity, with clinical environments well protected amid the challenges of seasonal heat and ongoing infrastructure works.<\/p>\n\n\n\n<p class=\"eplus-wrapper wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A large hospital undertook a major initiative to upgrade its infrastructure. To ensure continuity and maintain system redundancy during the summer months of improvement works, hospital administrators engaged ICS Cool Energy to provide a reliable temporary cooling solution, enabling uninterrupted healthcare services and minimising operational risks. Challenge As part of an infrastructure upgrade programme, the &#8230; <a title=\"Safeguarding Hospital Cooling: ICS Cool Energy Delivers Emergency Chiller Solution During Infrastructure Upgrades\" class=\"read-more\" href=\"https:\/\/www.icscoolenergy.com\/ie\/case-studies\/uncategorized\/safeguarding-hospital-cooling-ics-cool-energy-delivers-emergency-chiller-solution-during-infrastructure-upgrades\/\" aria-label=\"Read more about Safeguarding Hospital Cooling: ICS Cool Energy Delivers Emergency Chiller Solution During Infrastructure Upgrades\">Read more<\/a><\/p>\n","protected":false},"author":12,"featured_media":86470,"menu_order":0,"comment_status":"closed","ping_status":"open","template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_editorskit_title_hidden":false,"_editorskit_reading_time":0,"_editorskit_is_block_options_detached":false,"_editorskit_block_options_position":"{}","editor_plus_copied_stylings":"{}","footnotes":""},"applications":[],"products":[],"topics":[],"product_cat":[354,358],"class_list":["post-86464","case_study","type-case_study","status-publish","format-standard","has-post-thumbnail","hentry","product_cat-emergency-chiller","product_cat-temporary"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.1 (Yoast SEO v28.5) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Safeguarding Hospital Cooling: ICS Cool Energy Delivers Emergency Chiller Solution During Infrastructure Upgrades | Ireland<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.icscoolenergy.com\/ie\/case-studies\/uncategorized\/safeguarding-hospital-cooling-ics-cool-energy-delivers-emergency-chiller-solution-during-infrastructure-upgrades\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Safeguarding Hospital Cooling: ICS Cool Energy Delivers Emergency Chiller Solution During Infrastructure Upgrades\" \/>\n<meta property=\"og:description\" content=\"A large hospital undertook a major initiative to upgrade its infrastructure. To ensure continuity and maintain system redundancy during the summer months of improvement works, hospital administrators engaged ICS Cool Energy to provide a reliable temporary cooling solution, enabling uninterrupted healthcare services and minimising operational risks. Challenge As part of an infrastructure upgrade programme, the ... Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.icscoolenergy.com\/ie\/case-studies\/uncategorized\/safeguarding-hospital-cooling-ics-cool-energy-delivers-emergency-chiller-solution-during-infrastructure-upgrades\/\" \/>\n<meta property=\"og:site_name\" content=\"Ireland\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-29T11:47:10+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.icscoolenergy.com\/wp-content\/uploads\/sites\/6\/2026\/05\/Hospital-Chiller-Delivery-01-scaled-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2524\" \/>\n\t<meta property=\"og:image:height\" content=\"2560\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.icscoolenergy.com\\\/ie\\\/case-studies\\\/uncategorized\\\/safeguarding-hospital-cooling-ics-cool-energy-delivers-emergency-chiller-solution-during-infrastructure-upgrades\\\/\",\"url\":\"https:\\\/\\\/www.icscoolenergy.com\\\/ie\\\/case-studies\\\/uncategorized\\\/safeguarding-hospital-cooling-ics-cool-energy-delivers-emergency-chiller-solution-during-infrastructure-upgrades\\\/\",\"name\":\"Safeguarding Hospital Cooling: ICS Cool Energy Delivers Emergency Chiller Solution During Infrastructure Upgrades | Ireland\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.icscoolenergy.com\\\/ie\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.icscoolenergy.com\\\/ie\\\/case-studies\\\/uncategorized\\\/safeguarding-hospital-cooling-ics-cool-energy-delivers-emergency-chiller-solution-during-infrastructure-upgrades\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.icscoolenergy.com\\\/ie\\\/case-studies\\\/uncategorized\\\/safeguarding-hospital-cooling-ics-cool-energy-delivers-emergency-chiller-solution-during-infrastructure-upgrades\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.icscoolenergy.com\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/2026\\\/05\\\/Hospital-Chiller-Delivery-01-scaled-1.jpg\",\"datePublished\":\"2026-05-29T11:47:06+00:00\",\"dateModified\":\"2026-05-29T11:47:10+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.icscoolenergy.com\\\/ie\\\/case-studies\\\/uncategorized\\\/safeguarding-hospital-cooling-ics-cool-energy-delivers-emergency-chiller-solution-during-infrastructure-upgrades\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.icscoolenergy.com\\\/ie\\\/case-studies\\\/uncategorized\\\/safeguarding-hospital-cooling-ics-cool-energy-delivers-emergency-chiller-solution-during-infrastructure-upgrades\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.icscoolenergy.com\\\/ie\\\/case-studies\\\/uncategorized\\\/safeguarding-hospital-cooling-ics-cool-energy-delivers-emergency-chiller-solution-during-infrastructure-upgrades\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.icscoolenergy.com\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/2026\\\/05\\\/Hospital-Chiller-Delivery-01-scaled-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.icscoolenergy.com\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/2026\\\/05\\\/Hospital-Chiller-Delivery-01-scaled-1.jpg\",\"width\":2524,\"height\":2560},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.icscoolenergy.com\\\/ie\\\/case-studies\\\/uncategorized\\\/safeguarding-hospital-cooling-ics-cool-energy-delivers-emergency-chiller-solution-during-infrastructure-upgrades\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.icscoolenergy.com\\\/ie\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Case Studies\",\"item\":\"https:\\\/\\\/www.icscoolenergy.com\\\/ie\\\/case_study\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Safeguarding Hospital Cooling: ICS Cool Energy Delivers Emergency Chiller Solution During Infrastructure Upgrades\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.icscoolenergy.com\\\/ie\\\/#website\",\"url\":\"https:\\\/\\\/www.icscoolenergy.com\\\/ie\\\/\",\"name\":\"ICS Cool Energy\",\"description\":\"The Process Temperature Control Specialists\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.icscoolenergy.com\\\/ie\\\/#organization\"},\"alternateName\":\"ICS\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.icscoolenergy.com\\\/ie\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.icscoolenergy.com\\\/ie\\\/#organization\",\"name\":\"ICS Cool Energy\",\"url\":\"https:\\\/\\\/www.icscoolenergy.com\\\/ie\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.icscoolenergy.com\\\/ie\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.icscoolenergy.com\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/2024\\\/01\\\/ics-cool-energy-logo.svg\",\"contentUrl\":\"https:\\\/\\\/www.icscoolenergy.com\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/2024\\\/01\\\/ics-cool-energy-logo.svg\",\"caption\":\"ICS Cool Energy\"},\"image\":{\"@id\":\"https:\\\/\\\/www.icscoolenergy.com\\\/ie\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/ics-temperature-control\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@ICSCoolEnergyLtd\"],\"description\":\"ICS Cool Energy is a market leader for process and critical temperature control solutions that keep all types and sizes of businesses and industry running. Our headquarters are situated in Southampton, with offices throughout the UK and Europe, employing over 250 people in the UK alone.\",\"email\":\"info@icscoolenergy.com\",\"telephone\":\"0800 840 4210\",\"legalName\":\"ICS Cool Energy Limited\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"201\",\"maxValue\":\"500\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Safeguarding Hospital Cooling: ICS Cool Energy Delivers Emergency Chiller Solution During Infrastructure Upgrades | Ireland","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.icscoolenergy.com\/ie\/case-studies\/uncategorized\/safeguarding-hospital-cooling-ics-cool-energy-delivers-emergency-chiller-solution-during-infrastructure-upgrades\/","og_locale":"en_GB","og_type":"article","og_title":"Safeguarding Hospital Cooling: ICS Cool Energy Delivers Emergency Chiller Solution During Infrastructure Upgrades","og_description":"A large hospital undertook a major initiative to upgrade its infrastructure. To ensure continuity and maintain system redundancy during the summer months of improvement works, hospital administrators engaged ICS Cool Energy to provide a reliable temporary cooling solution, enabling uninterrupted healthcare services and minimising operational risks. Challenge As part of an infrastructure upgrade programme, the ... Read more","og_url":"https:\/\/www.icscoolenergy.com\/ie\/case-studies\/uncategorized\/safeguarding-hospital-cooling-ics-cool-energy-delivers-emergency-chiller-solution-during-infrastructure-upgrades\/","og_site_name":"Ireland","article_modified_time":"2026-05-29T11:47:10+00:00","og_image":[{"width":2524,"height":2560,"url":"https:\/\/www.icscoolenergy.com\/wp-content\/uploads\/sites\/6\/2026\/05\/Hospital-Chiller-Delivery-01-scaled-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.icscoolenergy.com\/ie\/case-studies\/uncategorized\/safeguarding-hospital-cooling-ics-cool-energy-delivers-emergency-chiller-solution-during-infrastructure-upgrades\/","url":"https:\/\/www.icscoolenergy.com\/ie\/case-studies\/uncategorized\/safeguarding-hospital-cooling-ics-cool-energy-delivers-emergency-chiller-solution-during-infrastructure-upgrades\/","name":"Safeguarding Hospital Cooling: ICS Cool Energy Delivers Emergency Chiller Solution During Infrastructure Upgrades | Ireland","isPartOf":{"@id":"https:\/\/www.icscoolenergy.com\/ie\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.icscoolenergy.com\/ie\/case-studies\/uncategorized\/safeguarding-hospital-cooling-ics-cool-energy-delivers-emergency-chiller-solution-during-infrastructure-upgrades\/#primaryimage"},"image":{"@id":"https:\/\/www.icscoolenergy.com\/ie\/case-studies\/uncategorized\/safeguarding-hospital-cooling-ics-cool-energy-delivers-emergency-chiller-solution-during-infrastructure-upgrades\/#primaryimage"},"thumbnailUrl":"https:\/\/www.icscoolenergy.com\/wp-content\/uploads\/sites\/6\/2026\/05\/Hospital-Chiller-Delivery-01-scaled-1.jpg","datePublished":"2026-05-29T11:47:06+00:00","dateModified":"2026-05-29T11:47:10+00:00","breadcrumb":{"@id":"https:\/\/www.icscoolenergy.com\/ie\/case-studies\/uncategorized\/safeguarding-hospital-cooling-ics-cool-energy-delivers-emergency-chiller-solution-during-infrastructure-upgrades\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.icscoolenergy.com\/ie\/case-studies\/uncategorized\/safeguarding-hospital-cooling-ics-cool-energy-delivers-emergency-chiller-solution-during-infrastructure-upgrades\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.icscoolenergy.com\/ie\/case-studies\/uncategorized\/safeguarding-hospital-cooling-ics-cool-energy-delivers-emergency-chiller-solution-during-infrastructure-upgrades\/#primaryimage","url":"https:\/\/www.icscoolenergy.com\/wp-content\/uploads\/sites\/6\/2026\/05\/Hospital-Chiller-Delivery-01-scaled-1.jpg","contentUrl":"https:\/\/www.icscoolenergy.com\/wp-content\/uploads\/sites\/6\/2026\/05\/Hospital-Chiller-Delivery-01-scaled-1.jpg","width":2524,"height":2560},{"@type":"BreadcrumbList","@id":"https:\/\/www.icscoolenergy.com\/ie\/case-studies\/uncategorized\/safeguarding-hospital-cooling-ics-cool-energy-delivers-emergency-chiller-solution-during-infrastructure-upgrades\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.icscoolenergy.com\/ie\/"},{"@type":"ListItem","position":2,"name":"Case Studies","item":"https:\/\/www.icscoolenergy.com\/ie\/case_study\/"},{"@type":"ListItem","position":3,"name":"Safeguarding Hospital Cooling: ICS Cool Energy Delivers Emergency Chiller Solution During Infrastructure Upgrades"}]},{"@type":"WebSite","@id":"https:\/\/www.icscoolenergy.com\/ie\/#website","url":"https:\/\/www.icscoolenergy.com\/ie\/","name":"ICS Cool Energy","description":"The Process Temperature Control Specialists","publisher":{"@id":"https:\/\/www.icscoolenergy.com\/ie\/#organization"},"alternateName":"ICS","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.icscoolenergy.com\/ie\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/www.icscoolenergy.com\/ie\/#organization","name":"ICS Cool Energy","url":"https:\/\/www.icscoolenergy.com\/ie\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.icscoolenergy.com\/ie\/#\/schema\/logo\/image\/","url":"https:\/\/www.icscoolenergy.com\/wp-content\/uploads\/sites\/6\/2024\/01\/ics-cool-energy-logo.svg","contentUrl":"https:\/\/www.icscoolenergy.com\/wp-content\/uploads\/sites\/6\/2024\/01\/ics-cool-energy-logo.svg","caption":"ICS Cool Energy"},"image":{"@id":"https:\/\/www.icscoolenergy.com\/ie\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/ics-temperature-control\/","https:\/\/www.youtube.com\/@ICSCoolEnergyLtd"],"description":"ICS Cool Energy is a market leader for process and critical temperature control solutions that keep all types and sizes of businesses and industry running. Our headquarters are situated in Southampton, with offices throughout the UK and Europe, employing over 250 people in the UK alone.","email":"info@icscoolenergy.com","telephone":"0800 840 4210","legalName":"ICS Cool Energy Limited","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"201","maxValue":"500"}}]}},"_links":{"self":[{"href":"https:\/\/www.icscoolenergy.com\/ie\/wp-json\/wp\/v2\/case_study\/86464","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.icscoolenergy.com\/ie\/wp-json\/wp\/v2\/case_study"}],"about":[{"href":"https:\/\/www.icscoolenergy.com\/ie\/wp-json\/wp\/v2\/types\/case_study"}],"author":[{"embeddable":true,"href":"https:\/\/www.icscoolenergy.com\/ie\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/www.icscoolenergy.com\/ie\/wp-json\/wp\/v2\/comments?post=86464"}],"version-history":[{"count":0,"href":"https:\/\/www.icscoolenergy.com\/ie\/wp-json\/wp\/v2\/case_study\/86464\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.icscoolenergy.com\/ie\/wp-json\/wp\/v2\/media\/86470"}],"wp:attachment":[{"href":"https:\/\/www.icscoolenergy.com\/ie\/wp-json\/wp\/v2\/media?parent=86464"}],"wp:term":[{"taxonomy":"applications","embeddable":true,"href":"https:\/\/www.icscoolenergy.com\/ie\/wp-json\/wp\/v2\/applications?post=86464"},{"taxonomy":"products","embeddable":true,"href":"https:\/\/www.icscoolenergy.com\/ie\/wp-json\/wp\/v2\/products?post=86464"},{"taxonomy":"topics","embeddable":true,"href":"https:\/\/www.icscoolenergy.com\/ie\/wp-json\/wp\/v2\/topics?post=86464"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/www.icscoolenergy.com\/ie\/wp-json\/wp\/v2\/product_cat?post=86464"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}