Chat with us, powered by LiveChat

Production contingency planning – it’s all in the preparation

Keeping your production running efficiently is essential for remaining profitable and keeping your customers happy.

To safeguard your production process and prevent equipment from failing, preventative maintenance plans should be followed with a contingency plan in place, should the worst happen. Even the highest quality equipment can fail when not looked after correctly.

In 2015, a global contact lens manufacturer turned to us to produce a contingency plan as part of their planned maintenance contract – an extra precaution to ensure that production never stops and their profits and customer relationships are protected.

To ensure the contingency plan could be executed, we prepared their production lines to receive temporary hire equipment, so that the units could be installed quickly, without affecting production.

The contingency plan was recently put to the test when a chiller ran low on refrigerant. Our engineer was called to the site and managed to reinstate the chiller while one of our hire units was installed – all without interrupting production, which resulted in a very happy customer.

“I would like to pass on my thanks and gratitude for the level of service Alistair and Neil provided late on Friday to help get the production up and running. The commitment and helpfulness provided shows a level of support that ICS Cool Energy should be proud of.”

Senior Facilities Co-Ordinator, Global Contact Lens Manufacturer

Keeping our customers’ production running efficiently is top of our priorities and this means ensuring their temperature control and process cooling equipment is operating correctly at all times across all their sites.

To discuss your process temperature control, maintenance and contingency plans, please contact us on 0800 774 7426.

First Published:

Talk To An Expert

Why not pick up the phone and talk to our friendly and experienced team? We make it easy - whether your need is big, small, long or short term, we're here to help.

Call now

for a free no obligation quote

Please enter a valid First Name.
Please enter a value for First Name.
Please enter a valid Last Name.
Please enter a value for Last Name.
Please enter a valid Company.
Please enter a value for Company.
Please enter a valid Site Postcode.
Please enter a value for Site Postcode.
Please enter a valid Telephone Number.
Please enter a value for Telephone Number.
Please enter a valid Email Address.
Please enter a value for Email Address.
Please enter a valid I confirm I have read the privacy policy and agree my personal details can be collected and stored electronically. Please note you have the right to remove your consent any time..
Please tick the privacy consent tickbox to send your message.
Sending Message...
{"fr":{"msg":"Voulez-vous voir la version fran\u00e7aise du site ICS Cool Energy?","msg_text_yes":"Oui","msg_text_no":"Non","default_language":"fr","default_url":"https:\/\/www.icscoolenergy.com\/fr\/manufacturing-production-contingency-planning\/?region=fr","languages":{"fr":"fr"}},"uk":{"msg":"Would you like to see the UK version of the ICS Cool Energy website?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/manufacturing-production-contingency-planning\/?region=uk","languages":{"en":"en"}},"de":{"msg":"M\u00f6chten Sie zur deutschen Version unserer Website wechseln?","msg_text_yes":"Ja","msg_text_no":"Nein","default_language":"de","default_url":"https:\/\/www.icscoolenergy.com\/de\/?region=de","languages":{"en":"en","de":"de"}},"nl":{"msg":"Would you like to see the UK version of the ICS Cool Energy website?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"nl","default_url":"https:\/\/www.icscoolenergy.com\/nl\/onderhoudsplan_klimaatinstallatie\/?region=nl","languages":{"nl":"nl"}},"ch":{"msg":"M\u00f6chten Sie zur deutschen Version unserer Website wechseln?","msg_text_yes":"Ja","msg_text_no":"Nein","default_language":"de","default_url":"https:\/\/www.icscoolenergy.com\/de\/?region=ch","languages":{"en":"en","de":"de","fr":"fr"}},"at":{"msg":"M\u00f6chten Sie zur deutschen Version unserer Website wechseln?","msg_text_yes":"Ja","msg_text_no":"Nein","default_language":"de","default_url":"https:\/\/www.icscoolenergy.com\/de\/?region=at","languages":{"en":"en","de":"de"}},"be":{"msg":"Wilt u de Belgische versie van de ICS Cool Energy website zien?","msg_text_yes":"Ja","msg_text_no":"Nee","default_language":"nl","default_url":"https:\/\/www.icscoolenergy.com\/nl\/onderhoudsplan_klimaatinstallatie\/?region=be","languages":{"en":"en","de":"de","fr":"fr","nl":"nl"}},"ie":{"msg":"Would you like to see the Ireland version of the ICS Cool Energy website?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/manufacturing-production-contingency-planning\/?region=ie","languages":{"en":"en"}},"it":{"msg":"Vuoi vedere la versione italiana del sito ICS Cool Energy?","msg_text_yes":"s\u00ec","msg_text_no":"no","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/manufacturing-production-contingency-planning\/?region=it","languages":{"en":"en","de":"de","fr":"fr","nl":"nl","it":"it"}},"tr":{"msg":"There is no Turkish translation of our website. Would you like to see the UK version of the ICS Cool Energy website?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/manufacturing-production-contingency-planning\/?region=tr","languages":{"en":"en","de":"de","fr":"fr","it":"it"}},"ro":{"msg":"\u00cen prezent nu avem o traducere \u00een rom\u00e2n\u0103 a site-ului nostru web, continua\u021bi \u00een englez\u0103?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/manufacturing-production-contingency-planning\/?region=ro","languages":{"en":"en","de":"de","fr":"fr","it":"it"}},"il":{"msg":"Would you like to see the UK version of our website?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/manufacturing-production-contingency-planning\/?region=il","languages":{"en":"en","de":"de","fr":"fr"}},"pl":{"msg":"Aktualnie nie posiadamy polskiego t\u0142umaczenia naszej strony internetowej. Chcesz kontynuowa\u0107 w j\u0119zyku angielskim?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/manufacturing-production-contingency-planning\/?region=pl","languages":{"en":"en","de":"de","fr":"fr"}},"gr":{"msg":"\u0391\u03c5\u03c4\u03ae\u03bd \u03c4\u03b7 \u03c3\u03c4\u03b9\u03b3\u03bc\u03ae \u03b4\u03b5\u03bd \u03ad\u03c7\u03bf\u03c5\u03bc\u03b5 \u03b5\u03bb\u03bb\u03b7\u03bd\u03b9\u03ba\u03ae \u03bc\u03b5\u03c4\u03ac\u03c6\u03c1\u03b1\u03c3\u03b7 \u03c4\u03bf\u03c5 \u03b9\u03c3\u03c4\u03cc\u03c4\u03bf\u03c0\u03bf\u03cd \u03bc\u03b1\u03c2, \u03c3\u03c5\u03bd\u03b5\u03c7\u03af\u03c3\u03c4\u03b5 \u03c3\u03c4\u03b1 \u03b1\u03b3\u03b3\u03bb\u03b9\u03ba\u03ac;","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/manufacturing-production-contingency-planning\/?region=gr","languages":{"en":"en","de":"de","fr":"fr","it":"it"}}}
#
{"fr":{"msg":"Voulez-vous voir la version fran\u00e7aise du site ICS Cool Energy?","msg_text_yes":"Oui","msg_text_no":"Non","default_language":"fr","default_url":"https:\/\/www.icscoolenergy.com\/fr\/manufacturing-production-contingency-planning\/?region=fr","languages":{"fr":"fr"}},"uk":{"msg":"Would you like to see the UK version of the ICS Cool Energy website?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/manufacturing-production-contingency-planning\/?region=uk","languages":{"en":"en"}},"de":{"msg":"M\u00f6chten Sie zur deutschen Version unserer Website wechseln?","msg_text_yes":"Ja","msg_text_no":"Nein","default_language":"de","default_url":"https:\/\/www.icscoolenergy.com\/de\/?region=de","languages":{"en":"en","de":"de"}},"nl":{"msg":"Would you like to see the UK version of the ICS Cool Energy website?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"nl","default_url":"https:\/\/www.icscoolenergy.com\/nl\/onderhoudsplan_klimaatinstallatie\/?region=nl","languages":{"nl":"nl"}},"ch":{"msg":"M\u00f6chten Sie zur deutschen Version unserer Website wechseln?","msg_text_yes":"Ja","msg_text_no":"Nein","default_language":"de","default_url":"https:\/\/www.icscoolenergy.com\/de\/?region=ch","languages":{"en":"en","de":"de","fr":"fr"}},"at":{"msg":"M\u00f6chten Sie zur deutschen Version unserer Website wechseln?","msg_text_yes":"Ja","msg_text_no":"Nein","default_language":"de","default_url":"https:\/\/www.icscoolenergy.com\/de\/?region=at","languages":{"en":"en","de":"de"}},"be":{"msg":"Wilt u de Belgische versie van de ICS Cool Energy website zien?","msg_text_yes":"Ja","msg_text_no":"Nee","default_language":"nl","default_url":"https:\/\/www.icscoolenergy.com\/nl\/onderhoudsplan_klimaatinstallatie\/?region=be","languages":{"en":"en","de":"de","fr":"fr","nl":"nl"}},"ie":{"msg":"Would you like to see the Ireland version of the ICS Cool Energy website?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/manufacturing-production-contingency-planning\/?region=ie","languages":{"en":"en"}},"it":{"msg":"Vuoi vedere la versione italiana del sito ICS Cool Energy?","msg_text_yes":"s\u00ec","msg_text_no":"no","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/manufacturing-production-contingency-planning\/?region=it","languages":{"en":"en","de":"de","fr":"fr","nl":"nl","it":"it"}},"tr":{"msg":"There is no Turkish translation of our website. Would you like to see the UK version of the ICS Cool Energy website?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/manufacturing-production-contingency-planning\/?region=tr","languages":{"en":"en","de":"de","fr":"fr","it":"it"}},"ro":{"msg":"\u00cen prezent nu avem o traducere \u00een rom\u00e2n\u0103 a site-ului nostru web, continua\u021bi \u00een englez\u0103?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/manufacturing-production-contingency-planning\/?region=ro","languages":{"en":"en","de":"de","fr":"fr","it":"it"}},"il":{"msg":"Would you like to see the UK version of our website?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/manufacturing-production-contingency-planning\/?region=il","languages":{"en":"en","de":"de","fr":"fr"}},"pl":{"msg":"Aktualnie nie posiadamy polskiego t\u0142umaczenia naszej strony internetowej. Chcesz kontynuowa\u0107 w j\u0119zyku angielskim?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/manufacturing-production-contingency-planning\/?region=pl","languages":{"en":"en","de":"de","fr":"fr"}},"gr":{"msg":"\u0391\u03c5\u03c4\u03ae\u03bd \u03c4\u03b7 \u03c3\u03c4\u03b9\u03b3\u03bc\u03ae \u03b4\u03b5\u03bd \u03ad\u03c7\u03bf\u03c5\u03bc\u03b5 \u03b5\u03bb\u03bb\u03b7\u03bd\u03b9\u03ba\u03ae \u03bc\u03b5\u03c4\u03ac\u03c6\u03c1\u03b1\u03c3\u03b7 \u03c4\u03bf\u03c5 \u03b9\u03c3\u03c4\u03cc\u03c4\u03bf\u03c0\u03bf\u03cd \u03bc\u03b1\u03c2, \u03c3\u03c5\u03bd\u03b5\u03c7\u03af\u03c3\u03c4\u03b5 \u03c3\u03c4\u03b1 \u03b1\u03b3\u03b3\u03bb\u03b9\u03ba\u03ac;","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/manufacturing-production-contingency-planning\/?region=gr","languages":{"en":"en","de":"de","fr":"fr","it":"it"}}}
You are currently viewing the UK version of the ICS Cool Energy website.
Click a flag to change language...