Chat with us, powered by LiveChat

New Milestone in Renewable Energy Expansion at Totton Facility

ICS Cool Energy an international market leader specialising in complete temperature control solutions for manufacturing process and facilities applications, celebrates the latest energy-saving improvements with the completion of the solar panel installation at its facility in Totton.

The installation of 500 photovoltaic (PV) solar panels increases the site’s operational energy efficiency, marking a significant step forward in ICS Cool Energy’s journey to reducing its carbon footprint. With a system design capacity of 209 kW, the solar panel installation is set to annually generate over 197000 kilowatt-hours (kWh) of energy. The facility’s average annual energy consumption is expected to reach little over 69% of the generated power, with the rest put back to the grid. The move to solar power will generate annual CO2 emissions savings estimated at up to 92,900 kg.

ICS Cool Energy Totton facility is currently home to total of 135 in-house staff and remote sales and technicians. The site has recently undergone significant expansion and refurbishment leading by example in the transition to sustainable industrial practices.

“The installation of solar panels marks another important step in the broader strategy for infrastructure improvements and renewable energy expansion at ICS Cool Energy facilities,” said Keith Holroyd, Quality, Health, Safety and Environment (QHSE) Manager at ICS Cool Energy. “By integrating renewable energy into our operations, we not only address our environmental responsibilities but want to highlight our dedication to enhancing our operational efficiencies and thus better serve the customers.”

The Totton project is part of a broader initiative by ICS Cool Energy and its parent company, a global climate innovator Trane Technologies (NYSE:TT). To confront climate change, Trane Technologies is reimagining its supply chain and operations to have a restorative impact on the environment. The company’s path towards its 2030 Sustainability Commitments includes leading by example in achieving net-zero carbon emissions, zero waste-to-landfill, net positive water use in its own operations, and its Gigaton challenge to reduce customer emissions by 1 billion metric tonnes.

First Published:

Talk To An Expert

Why not pick up the phone and talk to our friendly and experienced team? We make it easy - whether your need is big, small, long or short term, we're here to help.

Call now

for a free no obligation quote

Please enter a valid First Name.
Please enter a value for First Name.
Please enter a valid Last Name.
Please enter a value for Last Name.
Please enter a valid Company.
Please enter a value for Company.
Please enter a valid Site Postcode.
Please enter a value for Site Postcode.
Please enter a valid Telephone Number.
Please enter a value for Telephone Number.
Please enter a valid Email Address.
Please enter a value for Email Address.
Please enter a valid I confirm I have read the privacy policy and agree my personal details can be collected and stored electronically. Please note you have the right to remove your consent any time..
Please tick the privacy consent tickbox to send your message.
Sending Message...
{"fr":{"msg":"Voulez-vous voir la version fran\u00e7aise du site ICS Cool Energy?","msg_text_yes":"Oui","msg_text_no":"Non","default_language":"fr","default_url":"https:\/\/www.icscoolenergy.com\/fr\/?region=fr","languages":{"fr":"fr"}},"uk":{"msg":"Would you like to see the UK version of the ICS Cool Energy website?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/new-milestone-in-renewable-energy-expansion-at-totton-facility\/?region=uk","languages":{"en":"en"}},"de":{"msg":"M\u00f6chten Sie zur deutschen Version unserer Website wechseln?","msg_text_yes":"Ja","msg_text_no":"Nein","default_language":"de","default_url":"https:\/\/www.icscoolenergy.com\/de\/?region=de","languages":{"en":"en","de":"de"}},"nl":{"msg":"Would you like to see the UK version of the ICS Cool Energy website?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"nl","default_url":"https:\/\/www.icscoolenergy.com\/nl\/?region=nl","languages":{"nl":"nl"}},"ch":{"msg":"M\u00f6chten Sie zur deutschen Version unserer Website wechseln?","msg_text_yes":"Ja","msg_text_no":"Nein","default_language":"de","default_url":"https:\/\/www.icscoolenergy.com\/de\/?region=ch","languages":{"en":"en","de":"de","fr":"fr"}},"at":{"msg":"M\u00f6chten Sie zur deutschen Version unserer Website wechseln?","msg_text_yes":"Ja","msg_text_no":"Nein","default_language":"de","default_url":"https:\/\/www.icscoolenergy.com\/de\/?region=at","languages":{"en":"en","de":"de"}},"be":{"msg":"Wilt u de Belgische versie van de ICS Cool Energy website zien?","msg_text_yes":"Ja","msg_text_no":"Nee","default_language":"nl","default_url":"https:\/\/www.icscoolenergy.com\/nl\/?region=be","languages":{"en":"en","de":"de","fr":"fr","nl":"nl"}},"ie":{"msg":"Would you like to see the Ireland version of the ICS Cool Energy website?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/new-milestone-in-renewable-energy-expansion-at-totton-facility\/?region=ie","languages":{"en":"en"}},"it":{"msg":"Vuoi vedere la versione italiana del sito ICS Cool Energy?","msg_text_yes":"s\u00ec","msg_text_no":"no","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/new-milestone-in-renewable-energy-expansion-at-totton-facility\/?region=it","languages":{"en":"en","de":"de","fr":"fr","nl":"nl","it":"it"}},"tr":{"msg":"There is no Turkish translation of our website. Would you like to see the UK version of the ICS Cool Energy website?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/new-milestone-in-renewable-energy-expansion-at-totton-facility\/?region=tr","languages":{"en":"en","de":"de","fr":"fr","it":"it"}},"ro":{"msg":"\u00cen prezent nu avem o traducere \u00een rom\u00e2n\u0103 a site-ului nostru web, continua\u021bi \u00een englez\u0103?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/new-milestone-in-renewable-energy-expansion-at-totton-facility\/?region=ro","languages":{"en":"en","de":"de","fr":"fr","it":"it"}},"il":{"msg":"Would you like to see the UK version of our website?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/new-milestone-in-renewable-energy-expansion-at-totton-facility\/?region=il","languages":{"en":"en","de":"de","fr":"fr"}},"pl":{"msg":"Aktualnie nie posiadamy polskiego t\u0142umaczenia naszej strony internetowej. Chcesz kontynuowa\u0107 w j\u0119zyku angielskim?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/new-milestone-in-renewable-energy-expansion-at-totton-facility\/?region=pl","languages":{"en":"en","de":"de","fr":"fr"}},"gr":{"msg":"\u0391\u03c5\u03c4\u03ae\u03bd \u03c4\u03b7 \u03c3\u03c4\u03b9\u03b3\u03bc\u03ae \u03b4\u03b5\u03bd \u03ad\u03c7\u03bf\u03c5\u03bc\u03b5 \u03b5\u03bb\u03bb\u03b7\u03bd\u03b9\u03ba\u03ae \u03bc\u03b5\u03c4\u03ac\u03c6\u03c1\u03b1\u03c3\u03b7 \u03c4\u03bf\u03c5 \u03b9\u03c3\u03c4\u03cc\u03c4\u03bf\u03c0\u03bf\u03cd \u03bc\u03b1\u03c2, \u03c3\u03c5\u03bd\u03b5\u03c7\u03af\u03c3\u03c4\u03b5 \u03c3\u03c4\u03b1 \u03b1\u03b3\u03b3\u03bb\u03b9\u03ba\u03ac;","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/new-milestone-in-renewable-energy-expansion-at-totton-facility\/?region=gr","languages":{"en":"en","de":"de","fr":"fr","it":"it"}}}
#
{"fr":{"msg":"Voulez-vous voir la version fran\u00e7aise du site ICS Cool Energy?","msg_text_yes":"Oui","msg_text_no":"Non","default_language":"fr","default_url":"https:\/\/www.icscoolenergy.com\/fr\/?region=fr","languages":{"fr":"fr"}},"uk":{"msg":"Would you like to see the UK version of the ICS Cool Energy website?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/new-milestone-in-renewable-energy-expansion-at-totton-facility\/?region=uk","languages":{"en":"en"}},"de":{"msg":"M\u00f6chten Sie zur deutschen Version unserer Website wechseln?","msg_text_yes":"Ja","msg_text_no":"Nein","default_language":"de","default_url":"https:\/\/www.icscoolenergy.com\/de\/?region=de","languages":{"en":"en","de":"de"}},"nl":{"msg":"Would you like to see the UK version of the ICS Cool Energy website?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"nl","default_url":"https:\/\/www.icscoolenergy.com\/nl\/?region=nl","languages":{"nl":"nl"}},"ch":{"msg":"M\u00f6chten Sie zur deutschen Version unserer Website wechseln?","msg_text_yes":"Ja","msg_text_no":"Nein","default_language":"de","default_url":"https:\/\/www.icscoolenergy.com\/de\/?region=ch","languages":{"en":"en","de":"de","fr":"fr"}},"at":{"msg":"M\u00f6chten Sie zur deutschen Version unserer Website wechseln?","msg_text_yes":"Ja","msg_text_no":"Nein","default_language":"de","default_url":"https:\/\/www.icscoolenergy.com\/de\/?region=at","languages":{"en":"en","de":"de"}},"be":{"msg":"Wilt u de Belgische versie van de ICS Cool Energy website zien?","msg_text_yes":"Ja","msg_text_no":"Nee","default_language":"nl","default_url":"https:\/\/www.icscoolenergy.com\/nl\/?region=be","languages":{"en":"en","de":"de","fr":"fr","nl":"nl"}},"ie":{"msg":"Would you like to see the Ireland version of the ICS Cool Energy website?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/new-milestone-in-renewable-energy-expansion-at-totton-facility\/?region=ie","languages":{"en":"en"}},"it":{"msg":"Vuoi vedere la versione italiana del sito ICS Cool Energy?","msg_text_yes":"s\u00ec","msg_text_no":"no","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/new-milestone-in-renewable-energy-expansion-at-totton-facility\/?region=it","languages":{"en":"en","de":"de","fr":"fr","nl":"nl","it":"it"}},"tr":{"msg":"There is no Turkish translation of our website. Would you like to see the UK version of the ICS Cool Energy website?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/new-milestone-in-renewable-energy-expansion-at-totton-facility\/?region=tr","languages":{"en":"en","de":"de","fr":"fr","it":"it"}},"ro":{"msg":"\u00cen prezent nu avem o traducere \u00een rom\u00e2n\u0103 a site-ului nostru web, continua\u021bi \u00een englez\u0103?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/new-milestone-in-renewable-energy-expansion-at-totton-facility\/?region=ro","languages":{"en":"en","de":"de","fr":"fr","it":"it"}},"il":{"msg":"Would you like to see the UK version of our website?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/new-milestone-in-renewable-energy-expansion-at-totton-facility\/?region=il","languages":{"en":"en","de":"de","fr":"fr"}},"pl":{"msg":"Aktualnie nie posiadamy polskiego t\u0142umaczenia naszej strony internetowej. Chcesz kontynuowa\u0107 w j\u0119zyku angielskim?","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/new-milestone-in-renewable-energy-expansion-at-totton-facility\/?region=pl","languages":{"en":"en","de":"de","fr":"fr"}},"gr":{"msg":"\u0391\u03c5\u03c4\u03ae\u03bd \u03c4\u03b7 \u03c3\u03c4\u03b9\u03b3\u03bc\u03ae \u03b4\u03b5\u03bd \u03ad\u03c7\u03bf\u03c5\u03bc\u03b5 \u03b5\u03bb\u03bb\u03b7\u03bd\u03b9\u03ba\u03ae \u03bc\u03b5\u03c4\u03ac\u03c6\u03c1\u03b1\u03c3\u03b7 \u03c4\u03bf\u03c5 \u03b9\u03c3\u03c4\u03cc\u03c4\u03bf\u03c0\u03bf\u03cd \u03bc\u03b1\u03c2, \u03c3\u03c5\u03bd\u03b5\u03c7\u03af\u03c3\u03c4\u03b5 \u03c3\u03c4\u03b1 \u03b1\u03b3\u03b3\u03bb\u03b9\u03ba\u03ac;","msg_text_yes":"Yes","msg_text_no":"No","default_language":"en","default_url":"https:\/\/www.icscoolenergy.com\/new-milestone-in-renewable-energy-expansion-at-totton-facility\/?region=gr","languages":{"en":"en","de":"de","fr":"fr","it":"it"}}}
You are currently viewing the UK version of the ICS Cool Energy website.
Click a flag to change language...