Case Studies
September 28, 2018
Free Coolers Save Packaging Manufacturer ÂŁ120k a Year...
The Challenge With a focus on sustainability and the environment, our packaging...
Read More
September 28, 2018
New Inverter Compressor Chiller On R513a Provides Energy...
The Challenge Following an invite to tender for a ÂŁ16 MIL new build project...
Read More
August 6, 2018
Replacement chiller increases cooling capacity and reduces...
The Challenge A manufacturer and bottler for some of the world’s most...
Read More
March 28, 2018
Run/standby configuration minimises downtime for dental...
The Challenge – Chilled water supply for metal grinding in ambient...
Read More
November 22, 2017
Moth balling Manufacturing facility with energy efficient...
The Challenge A manufacturing facility was to be kept unused for an extended...
Read More
November 21, 2017
Boiler failure after refurbishment requires fast temporary...
The Challenge Following the extensive refurbishment of a leisure centre the...
Read More
November 21, 2017
Temporary heating allows uninterrupted police helicopter...
The Challenge In order to remain flying, the police helicopters must be...
Read More
November 21, 2017
Hire heaters support tennis courts drying...
The Challenge Unusually prolonged downpours led to localised floods effecting...
Read More
November 20, 2017
Failed annual inspection leads to more energy efficient hire...
The Challenge A household manufacturer of base chemicals required a reliable...
Read More