Safeguarding Hospital Cooling: ICS Cool Energy Delivers Emergency Chiller Solution During Infrastructure Upgrades

A large hospital in central England undertook a major initiative to upgrade its infrastructure. To ensure continuity and maintain system redundancy during the summer months of improvement works, hospital administrators engaged ICS Cool Energy to provide a reliable temporary cooling solution, enabling uninterrupted healthcare services and minimising operational risks.

Challenge

As part of an infrastructure upgrade programme, the hospital set out to further strengthen the resilience of its cooling system. Ordinarily, one chiller would operate while the second remained on standby, ready to maintain continuity should the primary unit require support. During the upgrade works, the facility management team needed to run both chillers simultaneously even under moderate conditions. This temporarily removed built-in redundancy and increased strain on the system.

With summer approaching and temperatures rising, the hospital required a reliable, efficient cooling system to ensure continuity across critical clinical spaces, operating theatres, wards, and communal areas. To support uninterrupted services and mitigate operational risk during the upgrade and high-demand season, administrators engaged ICS Cool Energy to provide temporary hire chillers as part of an integrated solution.

Solution

ICS Cool Energy was tasked with designing and deploying a complete temporary cooling system capable of taking over the building’s entire load, allowing the installed chillers to be safely switched off for upgrade during the summer months.

The solution centred on the installation of four 500kW chillers, delivering robust and reliable cooling capacity able to fully support the hospital’s requirements. To overcome limitations in the site’s existing power supply, particularly at the location earmarked for the equipment, ICS Cool Energy also provided two high-capacity 800kVA generators, ensuring uninterrupted operation throughout the duration of the works.

Engineers also navigated logistical complexities, including the safe routing of hundreds of metres of flexible hose from ground level up to the rooftop plant room and the placement of equipment in a confined access route, all while keeping essential hospital access clear for emergency vehicles and staff. Due to site restrictions, it was not possible to use standard crane-mounted vehicles for installation. Instead, a separate crane was employed specifically to lift all hoses and equipment onto the hospital roof, ensuring deployment could proceed swiftly and safely.

ICS Cool Energy team also undertook careful calculations to account for pressure drops throughout the extensive pipework. While the hospital’s main circulating pumps remained incorporated within the setup, additional measures were taken to sustain optimal flow and pressure across the temporary installation. Four 4-inch pumps were fitted on the suction line, complemented by an inverter-driven 4-inch pump on the delivery side. This configuration ensured that water circulated efficiently, maintaining stable cooling performance in all areas of the building at all times.

Results

By installing a robust and reliable temporary cooling solution, ICS Cool Energy enabled the facilities management team to confidently maintain correct temperatures throughout even the hottest summer months.

The complete delivery and installation process was managed efficiently by ICS Cool Energy’s project managers, resulting in a clean and orderly site with no disruption to hospital operations, patients, staff, or visitors. The hospital benefited from reassurance and continuity, with clinical environments well protected amid the challenges of seasonal heat and ongoing infrastructure works.

Featured Product Categories

Emergency chiller hire

Emergency chiller hire

Whether your emergency is for a critical operation, manufacturing process or HVAC requirement our emergency <a href="/chiller/chiller-hire/">chiller hire</a> will minimise downtime to keep your operation cool. We stock more than 500MW of rental chillers for next day delivery with emergency chiller hire ranging from 3kW to 1.4MW and water leaving temperatures of +15°C to -40°C. In an emergency, you need a fast and expert service. Our nationwide team of specialist engineers can survey your site and arrange same day delivery and when emergencies happen out of hours we can still deliver, install and commission 24/7 every day of the year to keep your operation running. Since 1989 we have responded to emergency chiller rental needs across all industrial, manufacturing and HVAC applications. We understand downtime is critical and costly and will work with you to provide the best solution for your business in the fastest possible time. <strong>Why choose us for emergency chiller hire?</strong> Whether you need equipment quickly to cover a breakdown, require additional kit to cover periods of high ambient temperature or increased demand – we can support your project with contract terms to suit you. With chillers available for immediate hire, we can survey your site and arrange delivery of equipment the same day. With our 24/7 operation, we can deliver, install and commission out of hours too – minimising your downtime and disruption to your operation.

Learn More
Temporary chiller hire

Temporary chiller hire

We are the UK's experts in temporary chiller hire for all process and comfort applications. Whether your temporary need is for seasonal demand or you are expanding, upgrading, modifying, replacing, maintaining or even relocating, we can help keep your critical operation running. We stock more than 500MW of temporary chillers to rent for next day delivery from 3kW to 1.4MW and water leaving temperatures of +15°C to -40°C. The installation of a temporary <a href="/chiller/chiller-hire/">chiller hire</a> needs to be safe, quick and effective. Our packaged i-Chillers are protected in transport frames for ease of transport and install, have low footprints with integrated components and can be quickly and safely installed with flanged, camlock or Bauer hoses for all onsite situations. For temporary chiller hire needs from just weeks to over 9 years we have experience of installing temporary chillers since 1989. Working with you, our team of technical specialists engineers will provide the best solution for your business. <strong>Why use us as your temporary chiller hire partner?</strong> On average, our chiller units are less than 1.5 years old, ensuring reliability and modern equipment for your business. We use the latest technology and all of our chiller units meet EcoDesign compliance. We also offer Dry Air Coolers alongside our chiller units to deliver Free Cooling and partial Free Cooling – reducing your energy consumption and costs when the ambient temperature drops. Following an initial on-site survey, your dedicated engineer will specify a solution to meet your exact needs. Delivery, installation and commissioning of your equipment will be arranged and carried out. We will take care of the full project for you and can also provide ongoing remote monitoring of your chillers too, so you can rest assured that they continue working efficiently and you’re well supported for 24/7 technical back-up.

Learn More