Failed annual inspection leads to more energy efficient hire solution
March 28, 2018
Run/standby configuration minimises downtime for dental...
The Challenge – Chilled water supply for metal grinding in ambient...
Read MoreNovember 22, 2017
Moth balling Manufacturing facility with energy efficient...
The Challenge A manufacturing facility was to be kept unused for an extended...
Read MoreNovember 21, 2017
Boiler failure after refurbishment requires fast temporary...
The Challenge Following the extensive refurbishment of a leisure centre the...
Read MoreNovember 21, 2017
Temporary heating allows uninterrupted police helicopter...
The Challenge In order to remain flying, the police helicopters must be...
Read MoreNovember 21, 2017
Hire heaters support tennis courts drying...
The Challenge Unusually prolonged downpours led to localised floods effecting...
Read MoreNovember 20, 2017
Failed annual inspection leads to more energy efficient...
The Challenge A household manufacturer of base chemicals required a reliable...
Read MoreNovember 20, 2017
Emergency boiler replacement after breakdown prevents hotel...
The Challenge A fully-booked hotel suffered a boiler breakdown, meaning the...
Read MoreMay 8, 2017
temperature control unit (TCUs) for Fusion Energy research...
The Challenge ICS Cool Energy is helping to develop solutions for the clean...
Read MoreApril 28, 2017
Emergency chiller hire for the united nations...
The Challenge When a building’s cooling system in the summer fails, a fast...
Read More