The Challenge
Following the extensive refurbishment of a leisure centre the building’s on-site boiler failed and a quick replacement was needed fast.
The Solution
After an on-site assessment a 1,3MW boiler was delivered and installed within 24 hours. The heating only boiler provided hot water to a plate heat exchanger. Its low noise design proved to be ideal as local housing backed onto the swimming pool’s site.
The Result
The centre was soon after able to reopen and provide a popular service to the local community.
“Our 1.3MW boiler is energy efficient providing excellent economy and is housed in a lockable ISO container which is so important on sites where the public are present.”